Skip to content
Razter
.JPG + POS

Drone survey & aerial capture

RTK/PPK-tagged aerial capture, flown to a plan and to the regs — the raw frames every other deliverable on this page starts from.

Sensor
RGB / multispectral
GSD
1.5–5 cm/px
Overlap
75–85%
Turnaround
48–72 h to raw delivery
What's included

RTK/PPK-tagged flights with ground control, flown to a plan and to the regs.

  • Geotagged imagery (.JPG + POS)

    Every frame carries its own position and orientation, ready for aerotriangulation.

  • Ground control

    GCPs laid and surveyed before the flight, not fitted to the output afterward.

  • Flight & GCP log

    Altitude, overlap, camera settings and control coordinates, so the capture is auditable, not just a photoset.

How it runs

No surprises between quote and handover.

  1. 01

    Scope & airspace check

    Boundary, required GSD and any airspace permissions confirmed before a flight is booked.

    Flight plan · permission status
  2. 02

    Ground control

    GCPs placed and surveyed to the accuracy the deliverable needs, ahead of the sortie.

    GCP coordinates
  3. 03

    Flight

    Flown to the plan — altitude, overlap and sun angle chosen for the processing step downstream, not for a nice photo.

    Raw geotagged frames
  4. 04

    QC & handover

    Coverage and overlap checked against the plan before frames leave the building.

    Frame set + flight log

Who this is for

  • Infrastructure & rail
  • Agriculture
  • Mining & quarrying
  • Urban planning
FAQ

Questions worth answering upfront.

What altitude do you fly at?
Set by the GSD you need and local airspace limits — typically 80–120 m AGL for centimetre-class ground sampling distance, lower for denser urban or vegetated sites.
Do you handle flight permissions?
Yes — airspace and any required clearances are checked and secured before a flight is scheduled, not after.
Can you fly the same site repeatedly for change tracking?
Yes — flight lines and altitude are logged so repeat sorties fly the same geometry, which is what makes epoch-to-epoch comparison valid later.
Start a project

Ready to scope this?

Start a project